This presentation provides information on doctrine and standards of risk-based corrective actions. Included in the presentation is an evaluation of effectiveness of institutional control-dependant cleanup plans. The presentation examines the details of the effectiveness of institutional controls, risk based corrective actions, and life cycle costs. The presentation was made at the Business of Brownfields Conference in Pittsburgh, PA on November 17, 2003.